Work Rate & the LCM Method

Time & Work — LCM method से शुरुआत

title

Work Rate & the LCM Method

  • Time & Work
  • Work Rate & the LCM Method
नमस्ते दोस्तों! MeraExam में आपका स्वागत है। आज का topic है — Time & Work — LCM method से शुरुआत। मैं promise करती हूँ, आज के बाद ये topic आपको आसान लगेगा। शुरू करें?
Scene 1/13
Learning Objective

Model work as rate per day and combine workers by adding rates using the LCM trick.

🎯 Learning Objective

Model work as rate per day and combine workers by adding rates using the LCM trick.

💡 Concept

  • A finishes a job in n days → A does 1/n of the work per day
  • Working together → RATES add, days never do
  • LCM method: let total work = LCM of the day-counts, so every rate becomes whole units/day
  • Time = Total work ÷ Combined rate

🧮 Key Formulas

1 day's work = 1/n

>

Together: 1/a + 1/b

>

Time = Work ÷ Rate

✏️ Easy Example

Q. A can do a job in 10 days and B in 15 days. In how many days will they finish it together?

  1. Work = LCM(10, 15) = 30 units
  2. A = 3/day, B = 2/day → together 5/day
  3. 30 ÷ 5 = 6

Answer: 6 days

🇮🇳 Real-Life Example

Diwali ki safai: alone you need 6 hours, your sister also needs 6 — together the house sparkles in 3. Rates added, time halved.

📝 Exam-Level Example

Q. A and B together can do a work in 12 days; A alone can do it in 20 days. In how many days can B alone do it?

  1. Work = LCM(12, 20) = 60 units
  2. Together = 5/day, A = 3/day
  3. B = 2/day → 60 ÷ 2 = 30

Answer: 30 days

📝 Exam-Level Example

Q. A, B and C can do a work in 12, 15 and 20 days respectively. In how many days will they finish it together?

  1. Work = LCM = 60 units
  2. Rates: 5 + 4 + 3 = 12/day
  3. 60 ÷ 12 = 5

Answer: 5 days

🪄 Memory Trick

Assume work = LCM of all the day-counts. Whole-number rates, zero fractions, half the solving time.

⚠️ Common Mistakes

  • ❌ Adding days instead of rates (10 + 15 = 25 days is wrong)
  • ❌ Forgetting to convert the combined rate back into time at the end

🏆 Exam Tips

  • ✅ Combined time is always LESS than the fastest individual time — instant sanity check
  • ✅ Write each worker's units/day above their name before touching the question

📌 Summary

  • Rate = 1/n per day
  • Together → add rates
  • LCM method kills fractions
  • Time = work ÷ combined rate